E2140

E2140

E2140

E2140



ED 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 --- UCS 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10--- Other 1 | 2 | 3
previous | next

ED - Page 3
Construction Center

The CONSTRUCTION CENTER is the headquarters. The MCU construction vehicles are built there to be used later in constructing all kinds of structures. The CONSTRUCTION CENTER is also used to build the BANTHA heavy transporter, the mobile repair unit HCU-M and the HEAVY LIFTER.
The CONSTRUCTION CENTER can also be used to build an MCU construction vehicle to build another CONSTRUCTION CENTER.

Armament: None
Armor: Resistant to conventional weapons
Resistance: High
Price: 2,500 Dollars
Energy usage: None – contains a power generator